Waipa State Mill Road, Rotorua | Under Construction
The trimline and bins are the back end of the sawmill. This is the second building to leverage CLT columns and beams as this is a cost-effective construction technique. Using CLT in place of LVL and Glulam brings capacity to the NZ mass timber market.